-
A Lot Scheduling Considering Dual Resource and Re-entrant in Semiconductor Manufacturing
Journal of Korean Society of Industrial and Systems Engineering :: Vol.49 No.3 pp.175-186
DOI:https://doi.org/10.11627/jksie.2026.49.3.175
Open abstract
A Lot Scheduling Considering Dual Resource and Re-entrant in Semiconductor Manufacturing
Journal of Korean Society of Industrial and Systems Engineering :: Vol.49 No.3 pp.175-186
DOI:https://doi.org/10.11627/jksie.2026.49.3.175