-
A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System
Dong-Ho Lee**†, Hyeok-Chol Kim*, Hyoung-Ho Doh*, Jae-Min Yu*, Jun-Gyu Kim*
Journal of Korean Society of Industrial and Systems Engineering :: Vol.35 No.3 pp.77-86
Open abstract